Building Design and Construction

Kensington (Aspen Hill) Fire Station 25

Funding/Expenditure Schedule: APPROVED

Project Team

Architect

Hughes Group Architects
22630 Davis Drive Suite 175
Sterling VA 20164
(703) 437-6600
Montgomery County Government
Department of General Services
Section Chief
Suresh Patel
(240) 777-6084
Project Manager
Susanne Churchill
(240) 777-6113

Current Phase: Construction

Phase 1 of the project is completed.
The fire fighters will move from their current location to the new temporary quarters made up of a temporary ‘fit-out” of the new apparatus bay and the provision of two trailers fit out with bunks and locker rooms that are connected by a walkway.
Phase 2 clearing has begun. Demolition of the existing building to start shortly.

Kensington (Aspen Hill) Fire Station #25 is an existing 12,000 square foot facility serving a densely populated area. This project provides for an additional 13,443 square feet for increased office and administrative space, dormitory space, living and dining areas, two new apparatus bays and associated storage areas. A renovation of the existing interior finishes and replacement of the heating/ventilation systems are also included in the project.

Growth in the Aspen Hill Area has increased demands on the existing fire station, which was constructed in 1988. The current facility lacks space for the number of firefighters assigned to this location, and needs additional space for the larger amount of fire apparatus needed at this station.

Plans and studies justifying the need for this station include the Fire, Rescue, Emergency Medical Services, and Community Risk Reduction Master Plan, October 2005 and the Station Location and Resource Allocation Study Report, September 2006.

Architectural and Construction Images

Electrical Rough Ins

Electrical Rough Ins

Framing Roof Deck

Framing Roof Deck

Grading

Grading

Load test

Load test

Metal Deck

Metal Deck

Overall Site

OverAll Site

Plumbing Rough Ins

PlumbingRoughIns

Retaining wall backfill and Compaction

Concrete Driveway

Generator

Roof

Progress_12

Siding

Site View

Phase 2 Clearing

Bay and Trailers

Progress_12

Walkway